|
Infrastructures:
Heze has complete infrastructures. The Beijing-Kowloon
Railway runs from north to south in Heze through
5 counties/districts; the new Asia-Europe continental
bridge (Rizhao-Rotterdam) winds from east to west
through 4 counties; the expressways, namely Rizhao-Dongming,
Jinan-Heze, Dezhou-Shangqiu, and Heze-Lankao,
cross in Heze and form the City Rim expressway;
four national high ways, No.105, No.106, No.220,
and No.327 run through the city; and numerous
provincial and county-level highways net in the
city. The two nearby airports, Zhengzhou and Jinan,
are within two-hour ride. Four generator units
have been put to operation in the 2150-MW Heze
Power Plant. Foreign affairs related organizations
in Heze are well operated, with the custom, quarantine
agency, railway/highway ports, and container stations
co-operated for many years. The City Administrative
Service Hall provides all-aspect, one-stop services
for investors from home and abroad. Direct access
to the ports makes it much easier for exports,
and lowers transportation costs significantly.
Trade
Advantages: The easy traffic
in Heze is making the city a relay station and
bridge tower for trade between south and north,
east and west. With Heze as the center, the area
within 100 km radius is becoming the largest trading
hub on the borders of four provinces Jiangsu,
Shandong, Henan, and Anhui.
Investment
Costs:
The land-use right: According to the Industries
involved and scale of investments, special offer
can be given on the price. The usage period: 50
years.
Rent: 5~8RMB/month for each m2 of standard workshop.
Electricity: Attachment: Free
Peak price: 0.611 RMB/KWH
Lowest price: 0.21 RMB/KWH
Water (including sewage drainage charge):
for living purpose 1.79 RMB/m3
for Industrial purpose 2.09 RMB/m3
for special business 2.38~2.6 RMB/m3
Heat (price of steam): 80 RMB/T
Remitted fares during construction period:
Land usage charge, management fare, civil air-defense
charge, civil infrastructure charge, power expansion
fare, tap water expansion fare, temporary transformer
charge.
Construction costs: steel structures 350~450
RMB/m2 (just for reference)
cement and bricks 450~550 RMB/m3 (just for reference)
Salaries: common workers 300~500 RMB/month (just
for reference, to be decided by the enterprises)
college graduates 500~900 RMB/month
insurances: injury insurance: 1% of the basic
salary
endowment insurance: 28% of the basic salary (7%
paid by the employee)
unemployment insurance: 3% of the basic salary
(1% paid by the employee)
medical insurance: 8% of the basic salary (2%
paid by the employee)
Environment
Guarantee:
The people are honest and hospitable in Heze,
and the public security has enjoyed a long-term
peace. The city and county governments set up
information consultation center, administrative
approving center, service and complaint center,
which can provide one-stop and all-in-row services.
The citizens regard foreign investors as guests
and friends. Whatever difficulties you have and
wherever you are in Heze, sincere help will come
to you in no time.
|